ABOUT
Checking
Savings
$
GIVE
OPPORTUNITIES

Our church building is over 40 years old. The front half of the building where the sanctuary is was built out of adobe, and the back half containing the office, kitchen, parsonage was built out of cement. The front of the building is slowly deteriorating and needs to be torn down and rebuilt. The church has saved almost $15,000 of the approximately $100,000 needed to rebuild. 

There are three phases of this project:

1.) Immediate remodeling. As rainy season approaches we urgently need to replace the roof on the second floor which has a heavy layer of adobe on it, and with the winds and rains the plaster on the underside is falling into the classrooms and water is coming through. 

2.) Land purchase. The neighbor has offered to sell us some of his land to the right of us. We are also looking to buy the land on the other side of the church which belongs to a bar. 

3.) Demolition and reconstruction. The final goal is to demolish the entire building and rebuild it to include more ample space in the sanctuary and classrooms as well as one floor for the parsonage.

MEDIA
PERSONNEL
Note to Missionary:
PROJECTS
Sharing the Gospel around the Globe.
Is this gift a pledge or special offering? 
Select below.
HOME